PLP

Stand: EVP5

PLP EV foundations are designed to be rapidly installed - no concrete required! Our foundations are low-carbon, expandable up to 3 metres, and made with recycled plastic.
 
We provide pre-configured connection plates which can be adjusted for specific chargers and pedestals, reducing onsite installation timefrom small Level 1 7kW chargers to larger 500kWh+ Charger Cabinets and EV Feeder Pillars.

Come visit us at EVP5 at the EV Cafe stand 5A80! 

Address

Preformed Line Products Ltd
18 East Portway
Andover
HAMPSHIRE
SP10 3LH
United Kingdom
Loading

Contact Exhibitor